| CAD drawing or plain structural sample | One or a few samples | About 3-10 business days | Existing dieline, dimensions, material, insert work, shipping time, and sample complexity. |
|---|
| Printed comp or finish sample | One or a few samples | About 1-3 weeks | Print method, color standard, substrate, coatings, foil, embossing, assembly, and proof source. |
|---|
| Short-run corrugated boxes or mailers | About 100-499 units. Some digital or sample orders can be lower. | Several working days to about 3 weeks | Digital cutting versus tooling, print coverage, size, board availability, gluing, and delivery. |
|---|
| Production corrugated packaging | About 500 units through truckload quantities. Runs of 5,000+ are common for larger orders. | About 2-6 weeks | Board, corrugator schedule, die, flexographic or digital print, converting, assembly, freight, and releases. |
|---|
| Printed corrugated packaging | One printed comp, short digital runs in the hundreds or low thousands, and larger repeat runs | About 1-6 weeks | Digital, flexographic, or litho-laminated print, color and coverage, plates, coating, proof, board, converting, and delivery. |
|---|
| Short-run folding cartons | About 50-1,499 units. Many quoted orders begin around 100. | About 1-3 weeks | Digital print, paperboard, versions, die cutting, gluing, windows, coatings, proof, plant capacity, and freight. |
|---|
| Production folding cartons | About 1,500 units and above. Runs of 5,000+ are common for larger orders. | About 2-8 weeks | Digital versus offset print, paperboard, die, coatings, foil, windows, folder-gluer work, versions, and proofs. |
|---|
| Rigid boxes | About 50-100 units for some short-run methods. Conventional setup-box work commonly starts around 500. | About 4-12 weeks | Board, wrap, printing, forming, insert, closure, hand work, approved physical sample, formed freight, and storage. |
|---|
| Displays and complex assembled packaging | One mockup can precede production in the hundreds or a multi-store rollout. | About 3-10 weeks | Structure, print, tests, components, assembly, labels, pallet preparation, destination, and launch date. |
|---|
| Partitions, pads, inserts, and foam | One or a few fit samples, then quantities matched to the outer pack or product run | About 1-6 weeks | Material, cavity count, die or cutting method, tolerances, assembly, outer pack, and delivery. |
|---|
| Foil, embossing, windows, coatings, and other special finishes | Added to the underlying carton or box quantity | Allow additional approval and production time. The quote confirms the schedule. | Tooling, registration, substrate, coverage, number of passes, curing, proof, outside finishing, and reject allowance. |
|---|
| Box, carton, or display assembly | Matched to the packaging production quantity | Starts after components and assembly instructions are approved and available | Component count, labor, line setup, gluing or fastening, inserts, handles, labels, pallet preparation, and destination. |
|---|
| Made-and-held packaging with scheduled releases | One production order with smaller agreed release quantities | The initial production schedule and each release schedule are separate | Total run, release size, forecast, storage term, safety stock, artwork changes, pallet count, freight, and replenishment. |
|---|
| Repeat order against an approved specification | Quoted by item and release | Often faster than the first order | Material availability, current tooling, unchanged files, plant capacity, held inventory, and freight. |
|---|