Order quantities and lead times

We can produce one-off samples, lower-volume launch orders, standard production runs, and high-volume repeat orders. The minimum and schedule depend on the package, material, print, finishing, tooling, quantity, freight, and required delivery date.

Planning ranges

Typical order quantities and lead times

These are planning ranges across our production network. The actual order may fall below or above them.

Package or stageIndicative quantityIndicative time after usable files and approvalMain variables
CAD drawing or plain structural sampleOne or a few samplesAbout 3-10 business daysExisting dieline, dimensions, material, insert work, shipping time, and sample complexity.
Printed comp or finish sampleOne or a few samplesAbout 1-3 weeksPrint method, color standard, substrate, coatings, foil, embossing, assembly, and proof source.
Short-run corrugated boxes or mailersAbout 100-499 units. Some digital or sample orders can be lower.Several working days to about 3 weeksDigital cutting versus tooling, print coverage, size, board availability, gluing, and delivery.
Production corrugated packagingAbout 500 units through truckload quantities. Runs of 5,000+ are common for larger orders.About 2-6 weeksBoard, corrugator schedule, die, flexographic or digital print, converting, assembly, freight, and releases.
Printed corrugated packagingOne printed comp, short digital runs in the hundreds or low thousands, and larger repeat runsAbout 1-6 weeksDigital, flexographic, or litho-laminated print, color and coverage, plates, coating, proof, board, converting, and delivery.
Short-run folding cartonsAbout 50-1,499 units. Many quoted orders begin around 100.About 1-3 weeksDigital print, paperboard, versions, die cutting, gluing, windows, coatings, proof, plant capacity, and freight.
Production folding cartonsAbout 1,500 units and above. Runs of 5,000+ are common for larger orders.About 2-8 weeksDigital versus offset print, paperboard, die, coatings, foil, windows, folder-gluer work, versions, and proofs.
Rigid boxesAbout 50-100 units for some short-run methods. Conventional setup-box work commonly starts around 500.About 4-12 weeksBoard, wrap, printing, forming, insert, closure, hand work, approved physical sample, formed freight, and storage.
Displays and complex assembled packagingOne mockup can precede production in the hundreds or a multi-store rollout.About 3-10 weeksStructure, print, tests, components, assembly, labels, pallet preparation, destination, and launch date.
Partitions, pads, inserts, and foamOne or a few fit samples, then quantities matched to the outer pack or product runAbout 1-6 weeksMaterial, cavity count, die or cutting method, tolerances, assembly, outer pack, and delivery.
Foil, embossing, windows, coatings, and other special finishesAdded to the underlying carton or box quantityAllow additional approval and production time. The quote confirms the schedule.Tooling, registration, substrate, coverage, number of passes, curing, proof, outside finishing, and reject allowance.
Box, carton, or display assemblyMatched to the packaging production quantityStarts after components and assembly instructions are approved and availableComponent count, labor, line setup, gluing or fastening, inserts, handles, labels, pallet preparation, and destination.
Made-and-held packaging with scheduled releasesOne production order with smaller agreed release quantitiesThe initial production schedule and each release schedule are separateTotal run, release size, forecast, storage term, safety stock, artwork changes, pallet count, freight, and replenishment.
Repeat order against an approved specificationQuoted by item and releaseOften faster than the first orderMaterial availability, current tooling, unchanged files, plant capacity, held inventory, and freight.

Price and minimums

What affects minimums and price

Tooling and setup

A die, printing plates, offset make-ready, foil or embossing tooling, window tooling, gluing setup, and assembly setup are spread across the quantity. Digital cutting or printing can remove some tooling at lower volumes but may cost more per unit.

Material and size

Board grade, flute, wall count, paperboard, rigid board, wrap, foam, insert material, blank size, sheet yield, and material minimums affect the feasible production quantity and cost.

Print, finish, and versions

Color count, coverage, direct digital or offset printing, litho lamination, coating, foil, embossing, windows, variable versions, and proof requirements change setup and production time.

Packing, storage, and freight

Flat versus formed delivery, assembly, pallet count, delivery distance, split destinations, inventory, and scheduled releases change the delivered cost and practical run size.

Delivery planning

Meeting a required delivery date

Approve structure before final print

A plain sample can confirm fit and assembly while artwork is completed, if the structure and copy schedule allow those reviews to proceed separately.

Use a launch run

A digitally printed or digitally cut launch quantity can cover an early requirement while conventional tooling or longer production is prepared. The launch run and later production may differ in appearance and unit cost.

Hold approved packaging inventory

A larger production order can be stored and released on an agreed schedule where repeat demand, storage cost, material exposure, and artwork obsolescence make that practical.

See inventory and scheduled delivery

Confirm the needed date and destination

Share the date packaging must arrive, the delivery ZIP code, appointment rules, number of locations, and whether delivery can be split. Those details let us check production and freight together.